PASS ASSIGNMENTS
Who’s Doing What
Ring 2 — Canonical Grounding
Ring 3 — Framework Connections
ASSIGNMENT TABLE
| AI/Model | Pass Type(s) | Papers | Status | Notes |
|---|---|---|---|---|
| Claude Opus | First Pass (Structure) | All 14 | ✅ Complete | Key points, axioms, questions |
| [Assign] | Mathematical | All 14 | ⬜ Pending | Equations, derivations |
| [Assign] | Theological | All 14 | ⬜ Pending | Scripture, doctrine |
| Codex (GPT-5) | Physics | All 14 | Complete | Evidence, predictions |
| [Assign] | Socratic | All 14 | ⬜ Pending | Logic chains |
| [Assign] | Adversarial | All 14 | ⬜ Pending | Steel-man objections |
| [Assign] | Evidence | All 14 | ⬜ Pending | Vault cross-references |
RECOMMENDED ORDER
Round 1 (Foundation Building)
- Mathematical - Get the equations right
- Theological - Get the scripture right
- Physics - Get the evidence right
Round 2 (Stress Testing)
- Socratic - Map the logic
- Adversarial - Find the weaknesses
Round 3 (Connection)
- Evidence - Pull everything from vaults
NOTES FOR DAVID
To assign an AI:
- Update this table with their name/model
- Point them to
00_INSTRUCTIONS_READ_FIRST.md - Tell them their pass type
- Let them work through all 14 papers
- Check their work in A_DATA_DUMP folders
Suggested AI capabilities:
| Pass Type | Ideal AI Characteristics |
|---|---|
| Mathematical | Strong at formal logic, LaTeX, physics notation |
| Theological | Knowledge of Greek/Hebrew, systematic theology |
| Physics | Current on QM, GR, experimental data |
| Socratic | Philosophical training, argument mapping |
| Adversarial | Skeptical mindset, knows standard objections |
| Evidence | Good at search, document retrieval |
COMPLETION CHECKLIST
After all passes:
- All 14 papers have all 6 pass types complete
- All RUNNING_LOG.md files reviewed for conflicts
- SYNTHESIS.md created for each paper
- Ready to move to C_DRAFT phase
TIMELINE (Suggested)
| Phase | Duration | Deliverable |
|---|---|---|
| Data Acquisition | 2-3 weeks | All passes complete |
| AI Interpretation | 1 week | Synthesis docs |
| Drafting | 2 weeks | C_DRAFT complete |
| Tier Splitting | 1 week | D_VERSIONS complete |
| Review | 1 week | Final polish |
| Total | 7-8 weeks | Ready for Substack |
Adjust based on AI availability and David’s schedule.
Canonical Hub: CANONICAL_INDEX